water for all

angola

owini project - Water for All

Water for All Program (Angola)

 

1st  phase – 152 systems in 5 Provinces

2nd phase – 62 systems in 2 Provinces

 

Designs are based on 3 main vectors:

  • Low energy consumption for the operation of the systems
  • Simplicity of operation and maintenance
  • Reliability of the integrated solution

 

1st phase Finance, design, build and operate water supply systems in 152 villages in 5 provinces in Angola

Water supply systems to 152 villages

Rural areas with a population between 1.000 and 5.000 inhabitants

 

Scope of works:

  • Water catchment, main pipe, water treatment plant, distribution network, public fountains, laundries, and showers
  • 1 year O&M (including training local administration staff)
  • Educational and awareness campaign for population and other users

 

DESCRIPTION:

 

The project takes place in 7 provinces​

Over 200 remote villages

Affected population: 750,000

Project completion: Aug. 2019

Typical  Project components:

Water pumping station

Water conveyance

Water filtration system

Water storage (reservoir)

Distribution of the water within the village end points (showers, laundries, fountains)

Zürcherstrasse 239, 8500

Frauenfeld, Switzerland

 

INFO@OWINI-WATER.COM

CALL US: +41 (0)52 723 04 30

Send

This field is required.

Thank You!

This field is required.

This field is required.

OWINI