water for all

angola

owini project - Water for All

Water for All Program (Angola)

 

1st  phase – 152 systems in 5 Provinces

2nd phase – 62 systems in 2 Provinces

 

Designs are based in 3 main vectors:

  • Low energy consumption for the operation of the systems
  • Simplicity of operation and maintenance
  • Reliability of the integrated solution

 

1st phase Finance, design, build and operate water supply systems in 152 villages in 5 provinces in Angola

Water supply systems to 152 villages

Rural areas with population between 1.000 and 5.000 inhabitants

 

Scope of works:

  • Water catchment, main pipe, water treatment plant, distribution network, public fountains, laundries and showers
  • 1 year O&M (including training local administration staff)
  • Educational and awareness campaign for population and other users

 

DESCRIPTION:

 

The project takes place in 7 provinces​

Over 200 remote villages

Affected population: 750,000

Project completion: Aug. 2019

Typical  Project components:

Water pumping station

Water conveyance

Water filtration system

Water storage (reservoir)

Distribution of the water within the village end points (showers, laundries, fountains)

BELAS BUSINESS PARK, EDIFÍCIO BENGO

SALA 203 ,2ND ANDAR

TALATONA, LUANDA, ANGOLA

INFO@OWINI-WATER.COM

CALL US: +244 225 200 132 

Send

This field is required.

Thank You!

This field is required.

This field is required.

OWINI