WAKO KUNGO

angola

owini project -Wako KUNGO 

Water supply project for irrigation and drinking

Drainage & Purification Project:

  • Related population: 200,000
  • Central pumping station on the Keve River
  • 20 km of water conveyance
  • Water purification for drinking and industry
  • Regular maintenance and cleaning with trenchers
  • Total Pumping Capacity: 900 m3 per hour (100m3 drinking water, 800m3 industrial and agricultural needs)

Zürcherstrasse 239, 8500

Frauenfeld, Switzerland

 

INFO@OWINI-WATER.COM

CALL US: +41 (0)52 723 04 30

Send

This field is required.

Thank You!

This field is required.

This field is required.

OWINI